How do we run budget vs actual from the budget workbook we already have?

Keep the budget in its Excel workbook. Querri reads it as a table, joins it to the ledger, and follows every revision you save, with a version history, a lock for the approved budget, a dashboard and a monitor.

Open Querri

What you'll need

Querri (Free trial) to read the workbook and build the Views

Your budget workbook and a ledger export: Step 1 says what each needs to hold

The keys both files share: entity, department, account and month

Free resources

Start your free trial here →

Sample data sets

Synthetic data for a made-up company with three entities. Not real financial data.

Need help?

If you have any questions, you can request a demo or email our team.

Before we begin

The budget lives in a workbook because that is where the assumptions and formulas are. The trouble starts after it is approved. A copy goes into the reporting pack, someone revises a line in March, and by June nobody is sure which file the variance report was built from.

This playbook keeps one workbook as the source and builds everything else on top of it.

How it works:

  • • Upload the budget workbook and the ledger
  • • Turn the Budget tab into a View
  • • Join the ledger and find the lines to explain
  • • Revise a budget cell, then lock the workbook
  • • Put it on a dashboard and set a monitor

Follow the steps

Open Querri →
1 Step 1:

Upload the budget workbook and the actuals ledger

Two files, one workspace:

  • •

    Budget workbook: the Excel file as it is. The Budget tab has one row per entity, department and account, and a column for each month.

  • •

    Actuals ledger (NetSuite, QuickBooks or any accounting system): monthly actuals by the same entity, department and account.

Both files need the same account codes and entity names. Prefer live data? Querri connects to your accounting system and your spreadsheets directly.

Tip: Give the two files a workspace of their own, so the budget's access and history stay separate from everything else.

  • Budget workbook
  • NetSuite ledger
  • QuickBooks ledger
  • Any ledger export
Querri One project
2 Step 2:

Turn the Budget tab into a View

A budget tab is wide: one column per month. To compare it with a ledger it has to be long, one row per line per month. Ask for that as a View, a saved table that follows the workbook:

Prompt

"Build a View called FY27 Budget by month from the Budget tab: one row per entity, department, account and month, with a month date and a budget amount. Leave out the total column. Then give me the full-year budget by entity."

The 48 budget lines became 576 rows. Querri's own check flagged the jump in row count, then explained it: 48 lines times 12 months. Canada budgets more expense than revenue for the year.

Turn the Budget tab into a View
EntityRevenueExpenses
US (USD)6,668,7675,153,465
CA (CAD)3,000,9453,454,762
UK (GBP)1,461,9991,406,240

FY27 budget by entity, each in its own currency.

3 Step 3:

Join the ledger and find the lines to explain

Build a second View that joins budget to actuals, and ask which lines are far enough from budget to need a reason. Test the year to date and each month, because they catch different things:

Prompt

"Build a View called FY27 Budget vs actual by month, joining the budget View to the ledger on entity, department, account code and month. Tell me how many ledger rows did not match. Then list the lines more than 5% and 5,000 away from budget for February to October, and any single month more than 25% and 5,000 away."

All 432 ledger rows matched a budget line. Three lines pass the year-to-date test, led by Canadian revenue, 5.2% under and slipping since June. The fourth only shows by month: US Marketing was 42% over in August.

Join the ledger and find the lines to explain
LineBudgetActualVariance
CA Sales revenue (CAD)2,209,9702,095,077-114,893 (-5.2%)
US Engineering salaries (USD)630,000664,672+34,672 (+5.5%)
UK Sales travel (GBP)20,40014,417-5,983 (-29.3%)
US Marketing, August only (USD)38,00053,960+15,960 (+42.0%)

The four lines to explain, February to October 2026.

4 Step 4:

Revise the budget in the workbook, then lock it

The August overrun was a trade show approved in July. The approval is in someone's email and the budget never changed, so the variance will be explained again every month. Open the workbook in Querri, choose Edit, set US Marketing for August to 54,000 and Save. Then ask:

Prompt

"I raised the US Marketing budget for August 2026 to 54,000 in the workbook. Read the budget vs actual View again: what does that line show now, and what is the US full-year expense budget?"

Both Views read the new number with nothing rebuilt by hand. Every save is a version you can download or restore. When the revision is approved, Lock the file with a note: it can't be edited, replaced or restored until it is unlocked.

Revise the budget in the workbook, then lock it
The file versions list in Querri with the workbook locked and a note
BeforeAfter
US Marketing budget, August38,00054,000
Variance for that line+15,960 (+42.0%)-40 (-0.1%)
US full-year expense budget5,153,4655,169,465
US expenses vs budget, Feb to Oct+1.5%+1.1%

The same questions before and after one cell changed.

5 Step 5:

Put it on a dashboard and set a monitor

Ask for a dashboard on the budget vs actual View, then a monitor so nobody has to remember to look.

What the dashboard says:

Canada's revenue is the story: 5.2% under budget for the year and 11.7% under in October. US engineering salaries have been over budget every month since July.

What you can create or export:

  • The budget vs actual table, to Excel, CSV or Google Sheets
  • A dashboard that refreshes on a schedule
  • A monitor that alerts in the Inbox when a line goes off plan
  • A presentation, to PDF or PowerPoint
Put it on a dashboard and set a monitor
The Budget lines off plan monitor listed in the Querri Library
EntityRevenueExpenses
US+0.4%+1.1%
CA-5.2%-0.3%
UK+0.5%-0.8%

Variance to budget by entity, February to October 2026, after the revision.

Run next month's budget review from the workbook you already have.

Try it on your own budget
Querri for finance See how Querri helps finance teams bring budget, actuals and billing together. See Querri for finance

Tips for a budget vs actual people trust

Leave the budget in its workbook

The assumptions and formulas stay where finance built them. The View did the reshaping, 48 lines into 576 rows, and the file was not changed by it.

Check the join before you read a variance

Ask how many ledger rows found no budget line. Here it was none of 432. A new account code that matches nothing would otherwise vanish from the report.

Test each month as well as the year to date

The August marketing overrun was 42% of that month's budget and did not pass the year-to-date test. Three lines passed one test, a fourth passed only the other.

Revise the budget when the plan changes

After the approved 16,000 went into the workbook, the line read 40 under. The original is still there as version one, and the lock note says which revision is in force.

Teach Querri your rules once. Every answer after that follows them.

What counts as off plan, which sign means over, when a revision is in force: say each rule once and Querri applies it to every question on the budget.

Show me how

Say it in chat

Settle a rule in conversation and the Librarian records it as a fact under Facts & Rules, attached to the table it governs. Every later question on that data applies it, whoever asks, and every view built afterwards carries it.

Prompt

"A budget line is off plan when its variance is more than 5% of budget and more than 5,000 in the entity's own currency. Save that as a rule for the budget vs actual table."

Or bring the document that already says it

Upload your budget policy or the chart of accounts like any other file. Querri files a From a document card in the Inbox with the statements it found, each with its page and exact words; tick the ones to keep and they become facts. The rules this playbook depends on:

  • Variance: actual minus budget, so a positive expense variance is an overspend
  • Variance percent: total variance over total budget, never an average of monthly percentages
  • Currency: each entity in its own currency, never added across entities
  • Off plan, year to date: more than 5% and more than 5,000 from budget
  • Off plan, single month: more than 25% and more than 5,000 from budget
  • Fiscal year: FY27 runs February 2026 to January 2027
  • Budget in force: the current version of the locked workbook
Prompt

"Read our budget policy and propose the rules it states about revisions, approvals and variance thresholds. I'll review them in the Inbox."

Where the rules reach

A rule is attached to the data, not to one person's chat, so it follows the data everywhere:

  • • Every question asked in chat, by anyone on the team
  • • Every view the Librarian builds on that data
  • • Every step of a project, including the code it writes
  • • Dashboards and scheduled runs, each time they refresh
  • • Claude and ChatGPT, when they ask Querri

You stay in control

Every rule is listed under Facts & Rules next to the data it governs, where you can edit or remove it. Rules from a document wait for your tick in the Inbox, and a Worth remembering card is how Querri offers one it noticed itself. Workspaces and roles decide who can change what. Company-wide rules go in Settings → Customize; the Library is where the rest lives.

The payoff on review day

The budget review stops arguing about which file is right and starts on Canada's revenue. Changing a threshold is a sentence, not a rebuild.

Frequently asked questions

Do we have to move the budget out of Excel?
No. The workbook is uploaded as it is, formulas and tabs included. Querri builds a View from the Budget tab: in this sample a 48-line tab with twelve month columns became 576 rows, one per line per month. The workbook itself is not changed by that.
What happens to the reports when someone changes a budget cell?
The Views read the saved workbook. In this run the US Marketing budget for August went from 38,000 to 54,000 and the same question returned a variance of -40 in place of +15,960. A dashboard built from a project shows the new number once that project runs again.
How do we stop changes once the budget is approved?
Lock the file and add a note saying why. A locked workbook can't be edited, replaced or restored to an older version until someone with access to the Library unlocks it. The Views and dashboards built on it keep working.
Can we see what the budget was before a change?
Yes. Each save is a new version of the file with its date and time, and any earlier version can be downloaded or restored. The editor also saves on its own about ten seconds after a change, so one sitting can leave several versions.
How does this handle more than one currency?
Each entity stays in its own currency and totals are never added across entities. The sample has US dollars, Canadian dollars and pounds. For a group total, the group consolidation playbook adds exchange rates from a workbook and eliminates intercompany.
Does the ledger have to be a file?
No. The sample uses a CSV export so you can follow along, 432 rows for February to October 2026. Querri also connects to NetSuite and QuickBooks Online, and an export from any other accounting system works the same way.
What does the monitor alert on?
It measures the budget vs actual View each time the View rebuilds and watches each entity and department separately, nine in this sample. A line counts as off plan when it is more than 10% and more than 5,000 away from budget. Alerts arrive in the Inbox.
What about consolidation and scenario planning?
They work the same way, from workbooks you keep. The group consolidation playbook translates three entities to US dollars and eliminates intercompany from one settings workbook. The driver-based scenario planning playbook runs Base, Downside and Upside from a plan workbook and follows it when a driver changes.
How often should this run?
After each close. Load the new month of actuals, and the budget vs actual View picks it up along with any budget revisions saved since. Schedule the dashboard's project to run after the ledger is in.